Yuhuan Jinlong Machinery Co.,Ltd.

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Home ProductsIntake Rocker Arm

MAN Intake Rocker Arm V8 Stamped Steel Forged 15L Intake Valve Rocker Arm 51.04201-0146

MAN Intake Rocker Arm V8 Stamped Steel Forged 15L Intake Valve Rocker Arm 51.04201-0146

MAN Intake Rocker Arm V8 Stamped Steel Forged 15L Intake Valve Rocker Arm 51.04201-0146
MAN Intake Rocker Arm V8 Stamped Steel Forged 15L Intake Valve Rocker Arm 51.04201-0146

Large Image :  MAN Intake Rocker Arm V8 Stamped Steel Forged 15L Intake Valve Rocker Arm 51.04201-0146 Get Best Price

Product Details:

Place of Origin: Zhejiang,China
Brand Name: Jinlong
Certification: IAFT16949

Payment & Shipping Terms:

Minimum Order Quantity: 50
Price: $5-$10 for one pices
Packaging Details: carton
Delivery Time: 20-30 days
Payment Terms: T/T, L/C
Supply Ability: 5000 set/month
Detailed Product Description
Material:: Steel OEM:: 51.04201-0146
OE Replacement: OE Standard Quality Certification: IAFT16949
Feature: Steel Forged Application: Trucks, Heavy Duty Vehicle
High Light:

MAN Intake Rocker Arm

,

Intake Rocker Arm V8

,

intake valve rocker arm 51.04201-0146

MAN Intake Rocker Arm V8 Stamped Steel Forged 15L Intake Valve Rocker Arm 51.04201-0146

 

Improvements have been made, however, in both efficiency of operation and construction materials. Many modern rocker arms are made from stamped steel, though some applications can make use of heavier duty materials.

 

Compatible Vehicle:

MAN Engine:V8 Displacement:15L

 

OE No.:51.04201-0146

 

Material:: Steel
OE Replacement: OE Standard Quality
Feature: Steel Forged
OEM:: 51.04201-0146
Certification: IAFT16949
Application: Trucks, Heavy Duty Vehicle


FAQ
Q1. What's quality of the goods you can provide?

A: Genuine parts from the original factory directly; OEM parts from the OEM factory, and aftermarket with high quality from reliable factory.

Q2. Can you accept sample orders?

A: Yes, our MOQ can be 1PC(SET).


Q3.What's your packing?

A: We usually pack our goods in cartons with our own brand attched or in neutral white boxes and brown cartons. Customized brand packing boxes(cartons) are acceptable upon your requirements.

 

Q4. How long is the delivery time?

A: Generally, we have stocks for most engine parts. And it will take 15 to 30 days for some engine assembly and parts. The specific delivery time depends on the items and the quantity of your order.

 

Q5. What’s your guarantee policy?

A: We provide 18 months’ warranty for our products, 6 months longer than the original manufacturer.

Contact Details
Yuhuan Jinlong Machinery Co.,Ltd

Contact Person: Sales Manager

Tel: +8615888616788

Send your inquiry directly to us